ASIC Design Flow |
Step 1: Prepare an Requirement Specification
Step 2: Create an Micro-Architecture Document.
Step 3: RTL Design & Development of IP's
Step
4: Functional verification all the IP's/Check whether the RTL is free
from Linting Errors/Analyze whether the RTL is Synthesis friendly.
Step 4a: Perform Cycle-based verification(Functional) to verify the protocol behaviour of the RTL
Step 4b: Perform Property Checking , to verify the RTL implementation and the specification understanding is matching.
Step
5: Prepare the Design Constraints file (clock
definitions(frequency/uncertainity/jitter),I/O delay definitions,
Output pad load definition, Design False/Multicycle-paths) to perform
Synthesis, usually called as an SDC synopsys_constraints, specific to synopsys synthesis Tool (design-compiler)
Step
6: To Perform Synthesis for the IP, the inputs to the tool are (library
file(for which synthesis needs to be targeted for, which has the
functional/timing information available for the standard-cell library
and the wire-load models for the wires based on the fanout length of
the connectivity), RTL files and the Design Constraint files, So that
the Synthesis tool can perform the synthesis of the RTL files and map
and optimize to meet the design-constraints requirements. After
performing synthesis, as a part of the synthesis flow,
need to build scan-chain connectivity based on the DFT(Design for Test)
requirement, the synthesis tool (Test-compiler), builds the scan-chain.
7: Check whether the Design is meeting the requirements (Functional/Timing/Area/Power/DFT) after synthesis.
Step 7a: Perform the Netlist-level Power Analysis, to know whether the design is meeting the power targets.
Step
7b: Perform Gate-level Simulation with the Synthesized Netlist to check
whether the design is meeting the functional requirements.
Step
7c: Perform Formal-verification between RTL vs Synthesized Netlist to
confirm that the synthesis Tool has not altered the functionality.
Step
7d: Perform STA(Static Timing Analysis) with the SDF(Standard Delay
Format) file and synthesized netlist file, to check whether the Design
is meeting the timing-requirements.
Step 7e: Perform Scan-Tracing , in the DFT tool, to check whether the scan-chain is built based on the DFT requirement.
Step
8: Once the synthesis is performed the synthesized netlist
file(VHDL/Verilog format) and the SDC (constraints file) is passed as
input files to the Placement and Routing Tool to perform the back-end
Actitivities.
Step 9: The next step is the Floor-planning, which
means placing the IP's based on the connectivity,placing the memories,
Create the Pad-ring, placing the Pads(Signal/power/transfer-cells(to
switch voltage domains/Corner pads(proper accessibility for Package
routing), meeting the SSN requirements(Simultaneous Switching Noise)
that when the high-speed bus is switching that it doesn't create any
noise related acitivities, creating an optimised floorplan, where the
design meets the utilization targets of the chip.
Step 9a :
Release the floor-planned information to the package team, to perform
the package feasibility analysis for the pad-ring .
Step 9b: To
the placement tool, rows are cut, blockages are created where the tool
is prevented from placing the cells, then the physical placement of the
cells is performed based on the timing/area requirements.The power-grid
is built to meet the power-target's of the Chip .
Step 10: The
next step is to perform the Routing., at first the Global routing and
Detailed routing, meeting the DRC(Design Rule Check) requirement as per
the fabrication requirement.
Step 11: After performing Routing
then the routed Verilog netlist, standard-cells LEF/DEF file is taken
to the Extraction tool (to extract the parasitics(RLC) values of the
chip in the SPEF format(Standard parasitics Exchange Format), and the
SPEF file is generated.
Step 12: Check whether the Design is
meeting the requirements
(Functional/Timing/Area/Power/DFT/DRC/LVS/ERC/ESD/SI/IR-Drop) after
Placement and Routing step.
Step 12a: Perform the Routed Netlist-level Power Analysis, to know whether the design has met the power targets.
Step
12b: Perform Gate-level Simulation with the routed Netlist to check
whether the design is meeting the functional requirement .
Step
12c: Perform Formal-verification between RTL vs routed Netlist to
confirm that the place & route Tool has not altered the
functionality.
Step 12d: Perform STA(Static Timing Analysis) with the SPEF file and routed netlist file, to check whether the Design is meeting the timing-requirements.
Step
12e: Perform Scan-Tracing , in the DFT tool, to check whether the
scan-chain is built based on the DFT requirement, Peform the
Fault-coverage with the DFT tool and Generate the ATPG test-vectors.
Step 12f: Convert the ATPG test-vector to a tester understandable format(WGL)
Step
12g: Perform DRC(Design Rule Check) verfication called as
Physical-verification, to confirm that the design is meeting the
Fabrication requirements.
Step 12h: Perform LVS(layout vs Spice)
check, a part of the verification which takes a routed netlist converts
to spice (call it SPICE-R) and convert the Synthesized netlist(call it
SPICE-S) and compare that the two are matching.
Step 12i : Perform the ERC(Electrical Rule Checking) check, to know that the design is meeting the ERC requirement.
Step
12j: Perform the ESD Check, so that the proper back-to-back diodes are
placed and proper guarding is there in case if we have both analog and
digital portions in our Chip. We have seperate Power and Grounds for
both Digital and Analog Portions, to reduce the Substrate-noise.
Step
12k: Perform seperate STA(Static Timing Analysis) , to verify that the
Signal-integrity of our Chip. To perform this to the STA tool, the
routed netlist and SPEF file(parasitics including coupling capacitances
values), are fed to the tool. This check is important as the
signal-integrity effect can cause cross-talk delay and cross-talk noise
effects, and hinder in the functionality/timing aspects of the design.
Step
12l: Perform IR Drop analysis, that the Power-grid is so robust enough
to with-stand the static and dynamic power-drops with in the design and
the IR-drop is with-in the target limits.
Step 13: Once the
routed design is verified for the design constraints, then now the next
step is chip-finishing activities (like metal-slotting, placing
de-coupling caps).
Step 14: Now the Chip Design is ready to go to the Fabrication unit, release files which the fab can understand, GDS file.
Step 15: After the GDS file is released , perform the LAPO check so that the database released to the fab is correct.
Step 16: Perform the Package wire-bonding, which connects the chip to the Package.