Audio Test System Manual
Audio Test System v1.43 Manual
After setup completed, there will be two shortcuts on the desktop. One
is for Error Code, and the other is for the application.
[pic]
Run the application. User must type in the Test Line Bench (format:
p_n_s) and choose the Line Group A or B. Hear, p is the number for plant, n
is the number for production line, and s is the number for the station.
Generally, we define the first right side station is p_n_1, the second
right side station is p_n_2, and the left side station is p_n_3. We define
day production line is Group A, and night line is Group B.
[pic]
The focus of this panel is OK button, if the Bench Number and Group are
both right. Press OK of Space to affirm. Then, we enter the main panel.
[pic]
There are 4 item in the……